My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011045
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
969
>
3500 - Local Oversight Program
>
PR0545144
>
ARCHIVED REPORTS_XR0011045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 9:11:26 AM
Creation date
1/9/2020 8:55:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011045
RECORD_ID
PR0545144
PE
3528
FACILITY_ID
FA0025676
FACILITY_NAME
CARNATION USA/CARNATION PLANT
STREET_NUMBER
969
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
969 E FREMONT ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Product thickness is calculated by subtracting the depth to <br /> product f rom the depth to water. In addition, water <br /> . elevations are adjusted for the presence of fuel with the <br /> following calculation: <br /> (Product Thickness) ( .$)+(Water Elevation) <br /> Corrected Water Elevation <br /> i <br /> Note: The factor of 0.8 accounts for the density difference <br /> between water and petroleum hydrocarbons. <br /> Newly installed wells will be allowed to stabilize for 24 <br /> hours after development prior to free product inspection. <br /> An acrylic Surface Sampler will be used for visual <br /> inspection of the groundwater in order to note sheens <br /> (difficult to detect with the Interface Probe) , odors, <br /> microbial action and sediments. The sampler is calibrated <br /> in inches and centimeters for visual inspection of product <br /> thickness. <br /> To reduce the potential for cross contamination between <br /> wells, the monitorings will take place in order from the <br /> least to most contaminated, if known. Wells containing free <br /> product will be monitored last. Between each well <br /> monitoring the equipment will be decontaminated. <br /> Water level data collected from the wells will be used to <br /> develop a groundwater contour map for the project site. <br /> Groundwater flow will be estimated to be perpendicular to <br /> equipotential lines drawn on the map. <br /> 10.0 Well Development Protocol <br /> Groundwater monitoring wells will be surged and developed <br /> prior to setting the surface seal. Approximately 10 times <br /> the volume of water in the casing will be withdrawn if <br /> possible. Casing volumes will be calculated in the <br /> following manner: <br /> Volume of Schedule 40 PVC Pipe <br /> Diameter I.D. Volume <br /> (inches) (inches) Gal/linear ft. <br /> ------------------------------------------ <br /> 2 2.067 0. 17 <br /> 4 4.026 0.66 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.