My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
969
>
3500 - Local Oversight Program
>
PR0545144
>
ARCHIVED REPORTS_XR0011056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 9:25:04 AM
Creation date
1/9/2020 8:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011056
RECORD_ID
PR0545144
PE
3528
FACILITY_ID
FA0025676
FACILITY_NAME
CARNATION USA/CARNATION PLANT
STREET_NUMBER
969
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
969 E FREMONT ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Names of collectors <br /> - Oates and tires of collection <br /> - Purpose of sample <br /> Sample distribut_on (e.g. , laboratory, archive, etc. ) <br /> Field observations <br /> w� <br /> Field measu-- events (e g PiD readings, pH, <br /> conductivity, water levels ) . <br /> - Other data recor:!s ( e.g development log, soil sampling <br /> report, well log, etc. ) <br /> Procedures for surface soil collection from shallow test <br /> pits are discussed in the appended Soil Sampling Protocol <br /> Soil samples will be collected using decontaminated <br /> equipment and placed in laboratory prepared containers. <br /> All drilling equipment, pipe, and mater_als coming in <br /> contact jith tt-e borenole material aill be decontaminated <br /> before use according to the procedures described in Section <br /> 5.0. All sampling equipment will be decontaminated prior to <br /> sampling following these same procedures. <br /> Soil samples will be collected as monitor-, ng well drilling <br /> progresses All do4nrole drilling equipment will be <br /> decontaminated prior to use and bet.4een use for each well <br /> according to the procedures described in Section 6.0. <br /> All well construction material, including well casing, <br /> screen, and cell caps, will be decontaminated prior to <br /> installation by stea- claan.Lng according to the procedures <br /> described in Sectlon 6.0. <br /> To prevent the transfer of surface coatamination to a well, <br /> a Portland cement and bentonite surface seal will be <br /> installed in conformance •-ith regulatory requirements. The <br /> casing will be fitted with a water tight locking cap. No <br /> solvent or 4lue will be used in well construction. The <br /> wellhead will be contained below grade in a water-tight <br /> traffic rated box or otherwise protected from damage. <br /> In order to assure that groundwater samples are obtained <br /> from formation material and not from the filter pack, wells <br /> will be purged in accordance with the appended <br /> Well Development Protocol. <br /> Samples will be placed in laboratory prepared containers <br /> appropriate for the analyses specified as indicated on Table <br /> 1. <br /> • rt_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.