My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011056
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
969
>
3500 - Local Oversight Program
>
PR0545144
>
ARCHIVED REPORTS_XR0011056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 9:25:04 AM
Creation date
1/9/2020 8:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011056
RECORD_ID
PR0545144
PE
3528
FACILITY_ID
FA0025676
FACILITY_NAME
CARNATION USA/CARNATION PLANT
STREET_NUMBER
969
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
969 E FREMONT ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� <br /> a C Sampling and Drilling Equipment DecontaminatLon <br /> All equipment uued for drilling, 4ell materials and sampling <br /> soil and groundwater gill be decontaminated prior to use <br /> All equipment used for collection of more than one sample, <br /> such as bailers and spoons, rill be decontaminated between <br /> each use to prevent cross contamination between samples <br /> Drilling equipment will be decontaminated prior to <br /> commencing drilling at each hole <br /> Equipment and well material decontamination will be <br /> conducted on an impermeable surface and all decontamination <br /> effluent will be contained. All surfaces of the equipment <br /> ` will be thoroughly rinsed with potable water. The equipment <br /> will be placed on a drying rack for air drying. The <br /> decontamination water will stored in containers certified <br /> for hazardous materials storage and disposed of in an <br /> approved Tanner. <br /> r� <br /> Sample equipment to be used for pesticides and organic <br /> analysis will be flashed in a nonphosphate detergent (Alconox <br /> or equivalent ) and rinsed Frith tap water, followed by <br /> deionized water and finally with acetone. If the equipment <br /> is £or metals analysis, the initial rinse .gill be ccnducted <br /> with 0.1 v nitric acid followed by tap grater and delonized <br /> i water. <br /> w� <br /> 7 J Field Equipment Calibration and Maintenance <br /> The following reasuring equipment may be used during the <br /> Remedial Investigation. Equipment is grouped by field <br /> s activity. Calibration procedures and freq:tency are listed <br /> for each piece. <br /> Fry <br /> Soil Sorbs and Well Installation- Steel and coated cloth <br /> tape. Calibration: none. <br /> Water Level Measurements in wells- Steel surveyors tape. <br /> Calibration: manufacturer supplied temperature correcticn <br /> � <br /> will be applied as applicable for field conditions . <br /> Electrical well sounders. Calibration: check against steel <br /> surveyor's tape. <br /> Organic Vapors- Photo ionization detector. Calibration. <br /> Daily field Calibration using a benzene standard. <br /> Groundwater pH Measurement- Digital pH meter. Calibration <br /> standard pH solutions of 4, 7, and 10 will be utilized for <br /> daily field calibration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.