Laserfiche WebLink
i <br /> i <br /> DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME.VALLEY WHOLESALE DRUG MPLE ANALYSIS PERFORMED .TPH-Gas, B T X E , <br /> 1401 WEST FREMONT T B,E <br /> STOCKTON,CA AMPLE TIME: 17 02 <br /> AMPLE CONTAINER(S): HCL PRESERVED <br /> V OA's& 1 BAILER BLANK <br /> ANALYSIS PERFORMED BY FGL LABS <br /> CLIENT- HUNTER&ASSOCIATES DATE: 07/0511996 <br /> PROJECT MANAGER: BILL HUNTER SAMPLE LOCATION- MW-1 <br /> AMPLER DON LIGHT START TIME. <br /> GROUNDWATER: XXX J�ADOSE- OTHER:WELL HEAD P I D READING 202 0 PPM <br /> CASING ELEVATION: FEET MSLCASING DIAMETER. 2 INCH <br /> DEPTH TO WATER 7 51 FEET CALCULATED CASING VOLUME 2 88 GAL <br /> DEPTH OF WELL- 25 20 FEET TOTAL VOLUME PURGED 12 0 GAL <br /> TIME VOLUME PH E.C. TEMP, O.R.P. COLOR OTHER <br /> gallons units Umhoslcm Degrees C: (Mvolts isua! <br /> 0 70 1830 258 NIA TURBID BLACK/GREY <br /> 30 71 1561 243 " LT TURBID GAS ODOR <br /> 60 71 1540 240 " <br /> 90 71 1546 241 CLEAR " <br /> 120 71 1543 239 <br /> PURGE METHOD : CENTRIFUGAL PUMP <br /> SAMPLE METHOD. l'STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE. DEPTH TO WATER AT SAMPLE TIME: 7 88' <br /> WELL INTEGRITY. CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS GOOD RECHARGE <br /> WEATHER- CLEAR SKIES &HOT <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS <br /> CLEANED IN THE FIELD WITH STEAM CLEANER&ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION: WESTERN MOST <br /> CONTAINMENT. POLY DRUMS <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 &7 0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />