Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL FIELD LOG <br /> PROJECT CAME:VALLEY WHOLESALE DRUG SAMPLE ANAt.YSM PERFORMED ; TPH Gas, 133 X_E <br /> 1401 WEST FREMONT SAMPLE TIMIE: 1110 <br /> STQCICTOK CA SAMPLE OONTAINER(S}. <br /> X1 O A.'s & 1 SAILER BLANK <br /> NALYSLS PERFORMED BY: FGL LABS <br /> CLIENT HUNTER & ASSOCIATES DATE 12/07/1995 <br /> PROJECT MANAGER BILL HUNTER AMPLE LOCATION MW-1 <br /> AMPLER DON LIGHT TART TIME <br /> GROUNDWATER XXX 11VADOSE OTHER P I D WELL HEAD READING 248 PPM <br /> CASING ELEVATION (FEET MSL) CASING DIAMETER 2 INCH <br /> DEPTH TO WATER 8 76 FEET CALCULATED CASING VOLUME 2 68 GAL <br /> DEPTH OF WELL 25 22 FEET TOTAL VOLUME PURGED 12 0 GAL <br /> TIME VOLUME PH 1C.C, Temp. COLOR OTHER <br /> gallons units urnhostom Degrees C (Visual) <br /> 0 70 1622 221 LT TURBID GAS ODOR <br /> 3 71 1513 21 7 <br /> 6 70 1483 21 6 CLEAR <br /> 9 71 1491 220 <br /> 12 71 1484 213 <br /> PURGE METHOD CENTRIFUGAL PUMP <br /> SAMPLE METHOD- 1' STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE. 8.80' DEPTH TO WATER AT SAMPLE TIME <br /> WELL INTEGRITY CAP AND SEAL ARE SECURE, LOCK IS INSTALLED <br /> REMARKS SHEEN DROPLETS OBSERVED <br /> WEATHER OVERCAST SKIES, SLIGHT BREEZE OUT OF THE NORTH <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER & ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION ON THE NORTHWEST SIDE <br /> CONTAINMENT DO T 17 DRUMS <br /> INSTRUMENTATION ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4 0 & 7 0) <br /> ORION CONDUCTIVITY METER <br /> • ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />