Laserfiche WebLink
8. a. Describe the method that will be utilized to purgeand/or inert the tank(s): <br /> TA <br /> b. Tank/Piping Hauler: 1 l <br /> Name \y <br /> Address City Zip <br /> Phone No.( ) <br /> Hauler Registration # (if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: A <br /> Name <br /> Address City Zip <br /> Phone No.( ) <br /> EPA ID# (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> 4/441 <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling of excavated soil: <br /> a) What material will be used to lin the tank pit and cover the stockpile? <br /> I ' ll <br /> b) What will be the final desti ation of the excavated stockpile? <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> Name N A Hauler Registration # <br /> Address CityZip <br /> Phone No. ( ) <br /> Page 5 <br />