My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1950
>
2900 - Site Mitigation Program
>
PR0523458
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 2:48:08 PM
Creation date
1/9/2020 2:35:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0523458
PE
2959
FACILITY_ID
FA0015852
FACILITY_NAME
FORMER TEC FACILITY
STREET_NUMBER
1950
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
952032041
APN
13336040
CURRENT_STATUS
01
SITE_LOCATION
1950 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> Mike Infurna [EH] <br /> From: Dotson, Paul [paul.dotson@earthtech.com] <br /> Sent: Wednesday, June 11, 2008 3:42 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Revised site plan 1950 W. Fremont Street, Stockton, CA <br /> Mike, <br /> The three wells installed at 1950 W. Fremont St., Stockton, CA (MW-1 though MW-3) were constructed as <br /> follows: <br /> . 2"diameter, 0.020"slotted Sched. 40 PVC screen from 5 to 20 feet bgs; <br /> . 2"diameter Sched. 40 PVC blank casing 0.5 to 5 feet bgs; <br /> • #2J12 Monterey sand 4 to 20 feet bgs; <br /> . Bentonite chips 3 to 4 feet bgs (hydrated at least 30 minutes); <br /> . Cement grout 2 to 3 feet bgs; <br /> . Concrete and 8-inch diameter well box 0 to 2 feet bgs. <br /> . Well MW-1 had to be moved approx. 30 feet south of the proposed location and was not installed until <br /> Tuesday, June 10th. Several attempts were made to hand auger at the proposed location but the drillers <br /> could not get below approx. 1 foot bgs due to gravel and cobbles. <br /> Water was measured in well MW-3 at approximately 8 feet bgs a couple of hours after installation. Well <br /> development will be completed on Friday. Please let me know if you need more information or have questions. <br /> Paul <br /> 6/1 1/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.