My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1950
>
2900 - Site Mitigation Program
>
PR0523458
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 2:46:31 PM
Creation date
1/9/2020 2:38:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523458
PE
2959
FACILITY_ID
FA0015852
FACILITY_NAME
FORMER TEC FACILITY
STREET_NUMBER
1950
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
952032041
APN
13336040
CURRENT_STATUS
01
SITE_LOCATION
1950 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Monitoring Work Plan <br /> 1950 West Fremont Street Stockton California <br /> TABLE OF CONTENTS <br /> Section Page <br /> 1.0 INTRODUCTION...............................................................................................................2 <br /> 1.1 LOCATION AND BACKGROUND......................................................................2 <br /> 1.2 INVESTIGATION PURPOSE AND OBJECTIVES..............................................3 <br /> 2.0 WELL INSTALLATION AND GROUNDWATER MONITORING................................4 <br /> 2.1 PRE-FIELD ACTIVITIES.......................................................................................4 <br /> 2.1.1 Permitting....................................................................................4 <br /> 2.1.2 Utility Clearance ...........................................................................4 <br /> 2.2 FIELD ACTIVITIES...............................................................................................4 <br /> 2.2.1 Soil Borings.................................................................................5 <br /> 2.2.2 Well Installation............................................................................5 <br /> 2.2.3 Well Development .........................................................................6 <br /> 2.3 GROUNDWATER MONITORING........................................................................6 <br /> 2.4 QUALITY ASSURANCE/QUALITY CONTROL..............................................7 <br /> 2.4.1 Field Quality Control Samples...........................................................7 <br /> 2.4.2 Laboratory Quality Control Samples....................................................7 <br /> 2.4.3 Data Review and Validation..............................................................7 <br /> 2.5 INVESTIGATION DERIVED WASTE MANAGEMENT....................................8 <br /> 2.6 REPORTING...........................................................................................................8 <br /> 3.0 REFERENCES ....................................................................................................................9 <br /> FIGURES <br /> Figure <br /> 1 Site Location Map <br /> 2 Site Vicinity Map <br /> 3 Historical Groundwater Concentrations and Proposed Monitoring Well Locations <br /> APPENDICES <br /> Appendix <br /> A Health and Safety Plan <br /> Project 102790 i December 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.