My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011464
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2085
>
3500 - Local Oversight Program
>
PR0545152
>
ARCHIVED REPORTS_XR0011464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:22:01 PM
Creation date
1/9/2020 3:06:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011464
RECORD_ID
PR0545152
PE
3526
FACILITY_ID
FA0004021
FACILITY_NAME
STOCKTON CITY TAXI CAB COMPANY
STREET_NUMBER
2085
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14111223
CURRENT_STATUS
02
SITE_LOCATION
2085 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associaws Inc. <br /> • Qualiry Assurance/pualiry Control flan <br /> Revised November 2002 <br /> 6.0 SA TLING IND DRILLING EQUIPMENT DECONTAMINATION <br /> :all equipment used for drilling and sampling will be decontaminated prior to use. All equipment <br /> used for collection of more than one sample, such as bailers and spoons, will be decontaminated <br /> between each use to prevent cross contamination between samples. Drilling equipment will be <br /> decontaminated prior to commencing drilling at each hole. Well construction materials will be <br /> cleaned as necessary, prior to installation. <br /> Equipment and well material decontamination will be conducted on an impermeable surface and <br /> all decontamination effluent will be contained. All surfaces of the equipment will be thoroughly <br /> decontaminated using a steam cleaner. The equipment will be placed on a drying rack for air <br /> drying. The decontamination water will be stored in containers certified for hazardous materials <br /> storage and disposed of in an approved manner. <br /> • <br /> Sample equipment to be used for pesticides and organic analysis will be washed in a <br /> nonphosphate detergent (Alconox or equivalent) and rinsed with tap water, followed by <br /> deionized water. If the equipment is for metals analysis, the initial rinse will be conducted with <br /> 0.1 N nitric acid followed by tap water and deionized water. <br /> 7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE <br /> The following measuring equipment may be used during the Remedial Investigation. Equipment <br /> is grouped by field activity. Calibration procedures and frequency are Listed by piece. <br /> Soil Borings and Well Dimensions <br /> Steel and coated cloth tape. Calibration: none. <br /> • w:ladrninlshe11slgagc-02.doc <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.