My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011464
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2085
>
3500 - Local Oversight Program
>
PR0545152
>
ARCHIVED REPORTS_XR0011464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:22:01 PM
Creation date
1/9/2020 3:06:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011464
RECORD_ID
PR0545152
PE
3526
FACILITY_ID
FA0004021
FACILITY_NAME
STOCKTON CITY TAXI CAB COMPANY
STREET_NUMBER
2085
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14111223
CURRENT_STATUS
02
SITE_LOCATION
2085 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC.Associates Inc. <br /> • Quality.Assuranc&Quaiiry Control Plan <br /> Revised November 1-002 <br /> All withdrawn groundwater will be stored on-site in 55-gallon waste drums unless permission is <br /> granted by the appropriate regulatory agency to discharge the water to the ground surface or <br /> sanitary sewer. Drummed water will be Iabeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> 11.0 SOIL SAMPLING PROTOCOL <br /> 11.1 Sample Collection During Drilling Activities <br /> A proposal will be submitted to the lead regulatory authority with proposed <br /> boring/sampling locations. The exact location and number of borings at each site will be <br /> determined in the field by the Project Geologist/Engineer. <br /> Prior to arriving at the sample site, the drill rig/augers will be steam cleaned and all <br /> sample equipment will be cleaned. Cleaning will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> For hollow-stem auger drilling methods, soil samples will be obtained using a California <br /> modified split-spoon sampler containing three 6-inch long, 2-inch diameter brass tubes. <br /> The sampler will be driven 18-inches ahead of the hollow stem auger by a 140-pound <br /> hammer with a 30-inch drop in accordance with American Society for Testing and <br /> Materials (ASTM) Methods D 1586-84 for split barrel sampling of soil and D 1587-83 <br /> for thin-walled tube sampling of soils. The blows required to drive the sampler each 6- <br /> inch interval will be recorded on the boring log. The sampler will be removed from the <br /> boring and opened to reveal the brass tubes. The bottom tube will be sealed with <br /> . w:ladminlshel€slgaac-02.doc <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.