Laserfiche WebLink
_ i^✓�OS� <br /> 4, 1 <br /> Cal/EPA Pete Wilson <br /> Governor <br /> State Water April '11, 1997 . Y <br /> Resources <br /> Control Board <br /> ROGER SCRIVEN <br /> Division of PANELLA TRUCKING, INC. i <br /> Clean Water 5000 FREMONT ST.E.' <br /> Programs STOCKTON, CA 95215 <br /> Mailing Address: <br /> P.O.Box 2 94421 � <br /> Sacramento.CA <br /> 21 UNDERGROUND STORAGE TANK CLEANUP.F'UND, CLAIM NO. 007309, FOR : r <br /> 94244-2120 SITE ADDRESS:. 2.150 FREMONYST E, STOCKTON <br /> 2014"r Street, <br /> Suite 130 The State WaterResources Control Board (State Board) is able to issue, pursuant to <br /> Sacramento,CA a licable regulations the enclosed Letter:of Commitment LOC in an amount not,to <br /> 95814 pp g (LOC) <br /> (916)227-4307 exceed $15,000. This"'LOC is based``upon our review of the corrective action costs you <br /> FAX(916)227-4530 reported to have incurred to date- .The LOC may be modified by the State Board: <br /> World Wide Web: <br /> http://www.swrcb.ca. <br /> govl--cwphomehome/ s.vIt ie� porim tant` you read ms an <br /> that ' d the terms conditions in the LOC. The State <br /> y t <br /> fundhome,htm Board will take stepsk to withdraw this.LOC after.90 calendar days from the date of <br /> this-letter unless you'proceed with due diligence with your cleanup effort. . <br /> NOTE: You must also submit your first reimbursement request for;th'e costs that you <br /> reported to have incurred.within 90 calendar days from the date of this letter or subrni't a <br /> written explanation as to the status of the cleanup and when a reimbursement request can <br /> be expected. Failure to submit a.request or.an approved explanation may result in the <br /> removal of committed funds. Claims filed with the Underground Storage Tank Cleanup. <br /> Fund far exceed the funding available and it is important that you snake use of the <br /> funding that has been committed to your,cleanup in a timely manner: <br /> You are reminded that you must comply with all regulatory agency time schedules and <br /> requirements and you must obtain three bids for any required corrective action. Only <br /> corrective action costs'required by the regulatory agency to protect_human health, safety <br /> and the environment can—be claimed'-for reimbursement. Unless waived in writing,you <br /> are.required to obtain preapproval of costs for all future corrective action work <br /> (form enclosed). If you have any questions on obtaining preapprovat of your costs or the <br /> three bid requirement;please call Christopher Stevens, our engineer assigned to claims in <br /> your Region, at (916).227-4519. ..Failure to obtain preapproval of your future costs may <br /> result in the costs not being reimbursed <br /> { <br /> - 1 <br /> Recycled Paper Qur mission is to.lireserve and enlrance.11le qualify gfC'uliJbrrria'v trrrler resources.rind <br /> ensure their proper allocufion and e ici011f tcse for die benefit of'presen1 and future,Y(mv,wtions. <br />