Laserfiche WebLink
,F <br /> 7Rble Permit No. 06-07Wp Markets Inc. <br /> 12. The barricading of any portion of City streets shall be subject to the approval of <br /> the City Traffic Engineer'l Traffic cones and warning signs shall be used to direct <br /> traffic and shall be installed in accordance with the Caltrans Manual of Traffic <br /> Controls for Construction`and Maintenance Work Zones or the WATCH Manual. <br /> 13. The permittee shall not close any traveled lanes and shall maintain adequate <br /> sight distance during installation, maintenance, or sampling of the well. <br /> Additionally, service truck's shall not obstruct pedestrian paths, driveways, and <br /> sidewalks. <br /> 14. Upon completion of water monitoring,, the well(s) shall be abandoned in <br /> accordance with the requirements of San Joaquin Public Health Services. i <br /> 15. The permittee shall be wholly responsible to adjust all well boxes/vaults to any <br /> and all grade changes that occur in the subject area due to construction, <br /> demolition, or any other occurrence. <br /> 16. Permittee, or his contractor, shall remove all Underground Service Alert markings <br /> following completion of the well(s) installation. <br /> JAMES B. GIOTTONINI <br /> PUBLIC WORKS DIRECTOR <br /> Cl OF ST CKTON <br /> GREGG S. MEISSNER <br /> DEVELOPMENT SERVICES MANAGER <br /> CITY OF STOCKTON <br /> ::ODMA\GRPW I S E\COS.P W.P W_Libmry:90124.1 <br />