Laserfiche WebLink
OCT-12-2004 TUE 07:54 AM QUIK. 'TOP MARKETS FAX NO, 5106571c44 P. 02 <br /> Quik SOD Mfirkets9 Iftes ,-tsaa <br /> 4567 Enterprise street•Frwn6nt,CA 98538•(510}G5y-aS40•Fex.(510)iS <br /> September 1,2004 � <br /> John Shivers,Pastor <br /> Centro de,Vida Cristiana <br /> 2295 )fast Fremont Street <br /> Stockton,CA 95205 <br /> Re: Access Agreement for Groundwater-Investigation <br /> 2295 East Fremont Street;![APN 141=220-011 <br /> Stockton, California <br /> Dear Pastor Shivers: <br /> Quik Stop Markets, Inc.(Quik Stop) requests pe <br /> rn�tssion to enter your property described <br /> monitoring:wel <br /> 1 at the location indicated on the enclosed <br /> ll a ou�udwater m g <br /> above and sesta gr - <br /> site map. <br /> Quik Stop is currently investigating groundwater conditions at and around its Market#39, <br /> located at 2285 East Fremont Street, San Joaquin County Publie Health Services, <br /> Environmental HealthDivision,,has approved a workplan to define the lateral and <br /> vertical extent of groundwater contaminaticin associated with Quik Stop's underground <br /> work plan includes a proposed monitoring well to be placed ih of near <br /> storage tanks. The p The well will be 2=iiach inside <br /> the parking lot at the southwest corner of your property. <br /> diameter casing in an 8-inch diameter boring extending to b0 feet total depth Upon <br /> completion, the we <br /> will be flush with the surface in a secure traffic rated vault. All drill <br /> cuttings and equipment will be removed from the site upon gornpletion and the area <br /> around the well will be returned to its origiiial condition. Drilling activity is anticipated <br /> to take one or two days to complete. <br /> An access agreement is necessary for the purpose of installing the monitoring well, <br /> periodic gauging, sampling, inspection, maintenance, and eventual removal of the <br /> monitoring well. Once the well is installed and initial groundwater samples taken, <br /> routine sampling of the monitoring well is expected to be required once each quarter. <br /> ere with church activities. <br /> Drilling and sampling phases are not expected to interf <br />