My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
3500 - Local Oversight Program
>
PR0545154
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:55:50 PM
Creation date
1/9/2020 3:30:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545154
PE
3528
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
02
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 1 <br /> I` Mr. Karvelot -2- March 12, 2003 <br /> All costs for corrective action must meet the requirements ofArticle-11, Chapter 16, <br /> Underground Storage Tank Regulations in order to be eligible for reimbursement. <br /> • The Fund will review any tasks/casts that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are necessary and reasonable. However, if costs <br /> exceed the above pre-approvedamounts, the Fund will be unable to expedite your <br /> Reimbursement Request. <br /> • The work products must be acceptable to the County. <br /> �� • <br /> Ifa, different scope of work becomes necessary;-then°you.must-requestpre-approval of.costs. _ <br /> on.the new scope of work. <br /> • Although I have referred to the Horizon Environmental proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract: the State of California <br /> cannot compel you to sign any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. <br /> Please remember that it is still necessary to submit the actual costs of the work'as explained in <br /> the Reimbursement Request Instructions to eonfirm.that the costs are consistentwith this pre- <br /> approval before you will be reimbursed. Please insure that'your:coiisultantprepares their I <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work,or increases in-the costs.. When the <br /> invoices are submitted you must include copies of all: + <br /> • subcontractor invoices, . <br /> • technical reports, when,available, and <br /> • applicable correspondence from the regulatory agency, <br /> Please call if you have any questions; I can be reached at(916)'341-5796. <br /> Sincerely, �. <br /> Mark Owens, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> CaliforaiN-Eu vironmeota/Protection Agency <br /> ' an <br /> �,r�RecydedPaper <br />
The URL can be used to link to this page
Your browser does not support the video tag.