My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2285
>
3500 - Local Oversight Program
>
PR0545154
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2020 3:55:50 PM
Creation date
1/9/2020 3:30:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545154
PE
3528
FACILITY_ID
FA0001659
FACILITY_NAME
QUIK STOP MARKET #7039
STREET_NUMBER
2285
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
141-214-03
CURRENT_STATUS
02
SITE_LOCATION
2285 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br /> > SAN JOAQUIN COUNTY <br /> r Unit Supervisors <br /> Q• f� ;°� - Donna K.Heran,R.E.H.S. P <br /> Director <br /> 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S, <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.T .I. <br /> Douglas W.Wilson,R.E.H.S. <br /> �aC!FOR'�P Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S, <br /> Laurie A.Co ulla,Man R.E.H.S. Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> QUIK STOP MARKETS / MIKE KARVELOT <br /> 4567 ENTERPRISE STREET FILE <br /> COPY <br /> FREMONT CA 95438 <br /> RE: Quik Stop Market #039 Site Code: 1111 <br /> 2285 E. Fremont St. RO#: 0000428 <br /> Stockton, CA. 95205 <br /> WORK PLAN: "Work Plan for Additional Groundwater Investigation" <br /> DATED: August 14, 2002 <br /> PREPARED BY: Horizon Environmental Inc. — Rexford K. Smith, RG, <br /> ..�� STATUS: APPROVED, with conditions noted below. <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S <br /> 25299.37, subd(c)(3A: <br /> • Two-phase subsurface lateral and vertical groundwater investigation <br /> for hydrocarbon and 1,2-DCA plume with phase #1 consisting of four <br /> onsite CPT borings ("313-1 thru SB-4") to 80', 90', and 100' bgs and, <br /> • Collect and analyze grab groundwater (only) samples for TPHg, <br /> BTEX, Oxygenates, 1,2-DCA, and EDB by 8260 in phase 1 and, <br /> • Install monitoring wells under work plan addendum for phase #2 as <br /> determined by data gathered in phase #1 and, <br /> Submit Sensitive Receptor Survey for 2000' radius in report of <br /> findings for this multi-phased approach. <br /> COMMENTS AND CONDITIONS: <br /> • Soil sampling for analytical determination not proposed. Any soil <br /> encountered with hydrocarbon organoleptic properties is to be <br /> submitted for UST protocol laboratory analyses and, <br /> • Submit EHD well permit application and fee. <br /> REASONS FOR DISAPPROVAL OF THE WORK PLAN H&S 25299.37 <br /> subd(c)(3A: <br /> • none <br /> DATED: August 29, 2002 BY: <br /> Michael Infurna, enior REHS (209) 468-3454 <br /> [X] - Faxed to consultant on: 3M. .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.