Laserfiche WebLink
19449 Riverside Drive,Suite 230,Sonoma,California 95476 <br /> CONESTOGA-ROVERS Telephone: 707935.4650 Facsimile: 7079356649 <br /> &ASSOCIATES vaww.CRAworidxom <br /> October 21,2011 Reference No. 240797 <br /> Mr.Mike Infurna RECEIVED <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street 0 C T 17 2011 <br /> Stockton,California 95202 <br /> ENVIRONMEN`aL HEALTH <br /> Dear Mr.Infurna: PERMIT/SERVICES <br /> Re: Shell-branded Service Station <br /> 2494 East Fremont Street <br /> Stockton,California <br /> SAP Code 136141 —-- _- <br /> Incident No.98996181 <br /> Agency No.R00251 <br /> Third Quarter 2011 Status Report <br /> Conestoga-Rovers&Associates(CRA)prepared this letter on behalf of Equilon Enterprises LLC dba Shell Oil <br /> Products US(Shell)in accordance with the quarterly reporting requirements of 23 CCR 2652d. The following is a <br /> summary of recent and planned future actions at the site. <br /> Actions During the Current Quarter&Request for Extension <br /> The cement sidewalk was repaired in front of the station in accordance with the encroachment permit <br /> obtained from the city of Stockton. The station itself has changed ownership and was inactive for a period of <br /> time,but has resumed operations. <br /> CRA continued preparation of a corrective action plan(CAP)which includes data from the August 2010 site <br /> investigation. Previously CRA had requested extensions for submittal of the CAP to allow for additional data <br /> from the semi-annual sampling event to be included in the document. At this time,we have included data from <br /> all previous sampling events and have obtained data from the adjacent sites consultant(Stantec)regarding the <br /> site at 2491 East Fremont Street.These data have been input into a computer program called GWSDAT which <br /> models plume behavior over time. At this time,based on our email correspondence with SJCEHD staff,we <br /> anticipate submitting the CAP on October 31,2011. <br /> A cucma Plarmed t:,r the New,Quaxlei <br /> We will conduct semiannual sampling of the monitoring wells at the site during the fourth quarter 2011,and <br /> submit a combined site investigation/corrective action plan. <br /> Status of Site and Plans for Near Future <br /> The site will be transitioned to a new CRA project manager,Mr. Larry Silva,after the CAP has been <br /> submitted. Mr.Silva can be reached after that date at 916-889-8914 or by email at lsilva®craworld.com <br /> Equal <br /> Emyloyment <br /> Opponunry Employer <br /> Worldwide Engineering,Environmental,Construction,and IT Services <br />