Laserfiche WebLink
CAIi BRIA <br /> Table 6, Well/Boring Data,Shell-branded Service Station,2494 East Fremont Street,Stockton,California <br /> Boring Surface Total Soil Sample(ft) First Encountered GW Screen Screen Depth(ft) <br /> Name Type Date Elev(ft) Depth(ft) Interval Depth(ft) Depth(ft) Elev(ft) Diam (In) Top Bottom Comments <br /> S-1 8"HSA boring 30-Apr-98 2179 65 5 - 515 -2971 2 45 65 <br /> 5-1-85 8'HSA boring 13-Dec-02 22 15 85 5 65 -4285 2 75 85 <br /> S-2 8"HSA boring 29-Apr-98 2154 65 5 - 515 -2996 2 45 65 <br /> S-3 8"HSA boring 30-Apr-98 2179 65 5 515 -2971 2 45 65 <br /> 5-3-84 8"HSA boring 11-Dec-02 2229 85 5 - 55 -3271 2 74 84 <br /> S-4 10 HSA boring 6-Dec-99 2266 615 5 - 51 5 -2884 4 37 57 <br /> 5-4-83 8"HSA boring 12-Dec-02 2269 835 5 - 58 -3531 2 73 83 <br /> SB-1 Geoprobe boring 28-Oct-97 - 315 4 - - - - - <br /> SB-2 Geoprobe boring 28-pct-97 355 4 - - - <br /> SB-3 Geoprobe boring 24-Apr-98 55 5 - 52 - <br /> SB-4 CPT Boring 13-Dec-99 - 120 Continuous - 57 - <br /> SB-5 CPT Boring 14-Dec-99 - 88 Continuous - 508 - - - <br /> SB-6 CPT Boring 15-Dec-99 120 Continuous - 56 - - <br /> SB-7 CPT Boring I l-Jun-01 120 Continuous - - - <br /> SB-8 CPT Boring 12-Jun-01 120 Continuous - - <br /> SB-9 CPT Boring 11 Jun-01 - 120 Continuous - - - <br /> SB-10 CPT Boring 14-Jun-01 120 Continuous - - - <br /> SB-1 I CPT Boring 13-Jun-01 120 Continuous - - - <br /> SB-12 CPT Boring 12-Nov-02 100 Continuous - - - <br /> SB-13 CPT Boring 12-Nov-02 100 Continuous - - - - <br /> SB-14 CPT Boring 12-Nov-02 100 Continuous - - - <br /> SB-15 CPT Boring 12-Nov-02 100 Continuous - - - - <br /> SB-16 CPT Boring 21-Nov-02 100 Continuous - - - - <br /> SB-18 CPT Boring 18-Nov-02 100 Continuous - - <br /> Abbreviations <br /> CPT=Cone Pentrometer Testing <br /> HSA=Hollow-stem auger <br />