Laserfiche WebLink
0 CAMBRIA <br /> have submitted the drilling permit application Field work is scheduled to take place in <br /> November 2002 (cone penetrometer testing) and December 20021 (well installation) <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> As per the June 24, 2002 EHD letter to Shell, we will implement annual oxygenate (seven) <br /> sampling in all site monitoring wells This will be performed each year during the fourth quarter <br /> of the year <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Joe Neely at <br /> (707)933-2361 <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> gv'le'� "4--� <br /> • Susan Lukaszewicz <br /> Staff Geologist <br /> C. e11 W Ep�O <br /> J"Neely, <br /> Senior Project Geologist <br /> RG 6927 No 6927 <br /> OF CgLIC-O <br /> Attachments <br /> Table I Additional Groundwater Analytical Data <br /> Figure 1 Site VicinitylSensitive Receptor Survey Map <br /> Figure 2 Groundwater Contour/Chemical Concentration Map <br /> Appendix A Blaine Tech Services, Inc - Groundwater Monitoring Report <br /> cc Ms Karen Petryna, Shell <br /> • Mr Marty Hartzell, Central Valley Regional Water Quality Control Board <br /> 0797 2 <br />