Laserfiche WebLink
Demolition and Asbestos = <br /> Notification and Abatement <br /> Will the project involve any destructive work (tile, flooring, wall, <br /> etc.)? If yes, then an asbestos survey will be required. If <br /> positive for ACM, then abatement will be required. <br /> Will the project involve any demolition of a weight-bearing <br /> member of a structure or a facility? If yes, then an asbestos <br /> survey will be required. If positive for ACM, then abatement will <br /> be required. <br /> Will the project involve any demolition of a weight-bearing <br /> member of a structure or a facility? If yes, then a 10-day <br /> NESHAP Notification is required, regardless of asbestos - dates <br /> must be certain (changing window, must re-notify). <br />