Laserfiche WebLink
Cecchini Trucking Company Inc. <br />SPCC Plan <br />April 2020 <br />Page 19 of 63 <br />SPCC Cross -Reference <br />Table 3 — SPCC Cross -Reference <br />Provision* <br />Plan Section <br />Page <br />112.3(d) <br />Professional Engineer Certification <br />7 <br />112.3(e) <br />Location of SPCC Plan <br />17 <br />112.5 <br />Plan Review <br />15 <br />112.7 <br />Management Approval <br />9 <br />112.7 <br />Cross -Reference with SPCC Rule <br />19 <br />112.7(a)(3) <br />General Information and Facility Diagram <br />22,40 <br />112.4 and 112.7(a)(4) <br />Discharge Notification (Emergency Contacts) <br />3, Appendix D (Pg.52) <br />112.7(a)(5) <br />Discharge Response (Emergency Procedures) <br />5 <br />112.7(b) <br />Potential Discharge Volume and Direction of Flow <br />24,25 <br />112.7(c) <br />Containment and Diversionary Structures <br />35 <br />112.7(d) <br />Practicability of Secondary Containment <br />35 <br />112.7(e)(f) <br />Training, Inspections, Tests, Reviews and Records <br />31 <br />112.7(g) <br />Security <br />30 <br />112.7(h) <br />Loading Area <br />29 <br />112.7 i() <br />Brittle Fracture Evaluation — N/A (no field -erected aboveground tank at <br />this facility) <br />30 <br />112.7(j) <br />Conformance with Applicable State and Local Requirements <br />22 <br />112.8(b) <br />Facility Drainage <br />24 <br />112.8(c)(1) <br />Material Compatibility <br />29 <br />112.8(c)(2) <br />Secondary Containment for Bulk Storage Containers <br />35 <br />112.8(c)(3) <br />Drainage of Diked Areas <br />N/A <br />112.8(c)(4) <br />Corrosion Protection (Cathodic) <br />N/A <br />112.8(c)(6) <br />Monthly Inspection <br />Appendix C (Pg.53) <br />112.8(c)(8) <br />Overfill Prevention System <br />28 <br />112.8(c)(9) <br />Effluent Treatment Systems <br />N/A <br />112.8(c)(10) <br />Visual Discharges <br />5, Appendix D (Pg.52) <br />112.8(c)(11) <br />Mobile and Portable Containers <br />30 <br />112.8 (d) <br />Transfer Operations <br />29 <br />112.20(e) <br />Certification of Substantial Harm <br />Appendix E (Pg.56) <br />Only relevant rule provisions are indicated. For a complete list of SPCC requirements, refer to the full text of 40 <br />CFR part 112. <br />