My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
5400
>
2800 - Aboveground Petroleum Storage Program
>
PR0545140
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:02 PM
Creation date
1/10/2020 9:28:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545140
PE
2832
FACILITY_ID
FA0025200
FACILITY_NAME
CECCHINI TRUCKING CO INC, CTC CFC
STREET_NUMBER
5400
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05516072
CURRENT_STATUS
01
SITE_LOCATION
5400 W HWY 12
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI SP001 AST Record <br />OWNER INFORMATION FACILITY INFORMATION INSTALLER INFORMATION <br />Jason Cecchini <br />Cecchini Trucking Company Inc. <br />SPECIFICATION: <br />Design: ® UL UL -142 <br />❑ API <br />❑ Unknown <br />Name <br />5400 W. Hwy. 12 <br />Name <br />5400 W. Hwy. 12 <br />Name <br />Number and Street <br />Lodi, CA 95242 <br />Number and Street <br />Lodi, CA 95242 <br />Number and Street <br />City, State, Zip Code <br />City, State, Zip Code <br />City, State, Zip Code <br />TANK ID <br />SPECIFICATION: <br />Design: ® UL UL -142 <br />❑ API <br />❑ Unknown <br />❑ SWRI <br />❑ Other <br />® Horizontal ❑ Vertical ❑ Rectangular <br />Manufacturer: Modern Welding Co. of California Contents: Diesel <br />Construction Date: 02/2006 Last Repair/Reconstruction Date: <br />Dimensions: 96" D X 32'L <br />Capacity: 12,000 -gal. Last Change of Service Date: 09/05/2019 <br />Construction: ❑ Bare Steel <br />❑ Coated Steel <br />❑ Double -Bottom <br />❑ Cathodically Protected (Check one: A. ❑ Galvanic or B. ❑ Impressed Current) Date Installed: <br />❑ Concrete ❑ Plastic/Fiberglass ❑ Other <br />® Double -Wall ❑ Lined Date Installed: <br />Containment: ❑ Earthen Dike <br />❑ Steel Dike ❑ Concrete <br />❑ Synthetic Liner ❑ Other Double -Walled Steel Tank <br />CRDM: ® <br />Date Installed: 09/05/2019 <br />Type: Double -Walled Steel Tank <br />Release Prevention Barrier: ❑ <br />Date Installed: <br />Type: <br />AST INSPECTION STANDARD 1 SEPTEMBER 2011 <br />COPYRIGHT© 2011 Steel Tank Institute <br />
The URL can be used to link to this page
Your browser does not support the video tag.