My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
5400
>
2800 - Aboveground Petroleum Storage Program
>
PR0545140
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:02 PM
Creation date
1/10/2020 9:28:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545140
PE
2832
FACILITY_ID
FA0025200
FACILITY_NAME
CECCHINI TRUCKING CO INC, CTC CFC
STREET_NUMBER
5400
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05516072
CURRENT_STATUS
01
SITE_LOCATION
5400 W HWY 12
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item <br />Task <br />Status <br />Comments <br />2.3 Supports <br />Check for corrosion, <br />❑Yes* ❑No ❑N/A <br />paint failure, etc. <br />2.4 Water <br />Water drains away <br />❑Yes ❑No* ❑N/A <br />drainage <br />from tank? <br />2.5 Tank <br />Strap secured and in <br />❑Yes ❑No* ❑N/A <br />grounding <br />good condition? <br />3.0 Cathodic Protection <br />3.1 Gavlvanic <br />Confirm system is <br />❑Yes ❑No* ❑N/A <br />cathodic <br />functional, includes the <br />protection <br />wire connections for <br />s ste <br />galvanic systems <br />3.2 Impressed <br />a. Inspect the <br />❑Yes ❑No* ❑N/A <br />current <br />operational <br />system <br />components (power <br />switch, meters, and <br />alarms). <br />b. Record hour meter, <br />❑Yes ❑No* ❑N/A <br />ammeter and <br />voltmeter readings. <br />4.0 Tank Shell, Heads, Roof <br />4.1 Coating <br />Check for coating <br />❑Yes* ❑ No <br />failure <br />4.2 Steel <br />Check for: <br />❑Yes* Li No <br />condition <br />• Dents <br />• Buckling <br />• Bulging <br />• Corrosion <br />• Cracking <br />4.3 Roof slope <br />Check for low points <br />❑Yes* ❑No ❑N/A <br />and standing water <br />5.0 Tank E ui ment <br />5.1 Vents <br />Verify that <br />❑Yes* Li No <br />components are <br />moving freely and vent <br />passageways are not <br />obstructed for: <br />• Emergency vent <br />covers <br />• Pressure/vacuum <br />vent poppets <br />• Other moving vent <br />components <br />AST INSPECTION STANDARD 8 SEPTEMBER 2011 <br />COPYRIGHT© 2011 Steel Tank Institute <br />
The URL can be used to link to this page
Your browser does not support the video tag.