My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2231-2238 – Tiered Permitting Program
>
PR0536175
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 10:23:20 AM
Creation date
1/10/2020 10:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0536175
PE
2231
FACILITY_ID
FA0012466
FACILITY_NAME
PREMIER FINISHING
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7910 S LONGE
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of permit by rule tiered permit violations that have <br /> not been addressed for PREMIER FINISHING as of June 27, 2019. <br /> Open violations from January 15, 2019 inspection <br /> Violation #109 - Failed to conduct and submit a phase one environmental assessment within one year. <br /> The facility could not provide a legible, signed Phase 1 Environmental Assessment during the inspection. <br /> A phase I environmental assessment means a preliminary site assessment based on reasonably available <br /> knowledge of the facility, including, but not limited to, historical use of the property, prior releases, visual and other <br /> surveys, records, consultant reports, and regulatory agency correspondence. <br /> The phase 1 environmental assessment shall consist of completion of the Phase 1 Environmental Assessment <br /> Checklist developed by DTSC pursuant to HSC Section 25200.14. <br /> A phase I environmental assessment shall be certified by the facility owner or operator or by the generator, or by <br /> their designee, or by a certified professional engineer, or a geologist, or an environmental assessor. <br /> Provide a copy of the complete, legible, certified, signed Phase 1 Environmental Assessment to San Joaquin <br /> County Environmental Health Department(EHD) and keep the original at the facility. <br /> Violation #113- Failed to submit correct PBR information in CERS. <br /> The Permit by Rule (PBR) section of the Waste and Treatment Process Combinations is incomplete in the <br /> California Environmental Reporting System (CERS). Section 2 indicates that Aqueous Wastes containing metals is <br /> treated by"precipitation". The process also uses"Phase Separation by Filter" by using the filter press and <br /> "Evaporation" by sludge heating. Indicate"yes" in CERS for the "Phase Separation by Filter" and "Evaporation" <br /> processes. <br /> The Treatment Unit Identification and Details in CERS are incomplete. Verify that the Monthly Treatment Volume is <br /> correct. Currently the volume of 30,000 gallons appears to include all waste water discharged to the City of <br /> Stockton sewer system. Only report the volume of hazardous waste water treated by the hazardous waste <br /> treatment system (precipitation, filter press and evaporation process). <br /> Expand the Treatment Process Description narrative to include the precipitation, filter press and evaporation <br /> processes. Include the number of days a year the FTU is in operation. <br /> In CERS, the Property Owner notification section states"exempt", and that the business owner is the property <br /> owner. According to County property records for Parcel ID 17726035 (this address), San Joaquin County is the <br /> property owner. Comply with Title 22 California Code of Regulations section 67450.2(b)(3)(C), and notify the <br /> property owner that the Fixed Treatment Unit(FTU) is in operation. Upload the notification document to CERS. <br /> Violation #213 - Failed to prepare a closure plan, notify the COPA of closure or submit a closure <br /> certification. <br /> OBSERVATION: According to the EHD inspection report dated April 26, 2017, the hexavalent chromium treatment <br /> unit was closed in early 2016. <br /> The TTU owner or operator shall remain in compliance with the applicable requirements of this section until the <br /> owner or operator submits to the Department a certification signed by the owner or operator and by an independent, <br /> professional engineer registered in California, that closure has been completed in accordance with the closure plan <br /> and that the closure plan meets or exceeds the applicable requirements of this chapter. <br /> CORRECTIVE ACTION: Provide to the EHD, a certification signed by the owner or operator and by an independent, <br /> professional engineer registered in California, that closure has been completed in accordance with the closure plan <br /> and that the closure plan meets or exceeds the applicable requirements of this chapter. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.