My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2231-2238 – Tiered Permitting Program
>
PR0536175
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 10:23:20 AM
Creation date
1/10/2020 10:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0536175
PE
2231
FACILITY_ID
FA0012466
FACILITY_NAME
PREMIER FINISHING
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7910 S LONGE
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Premier COatings, <br /> �l T <br /> ic DBA <br /> ATIN FOR MANUFNC <br /> Premier Finishing <br /> 7910 Longe St. <br /> Stockton, Ca 95206 <br /> Ph 209-982-5585 Fax 209-983-4050 <br /> Email:David@premierfinishing.com <br /> January 9,2015 <br /> TO: Environmental Health Dept. <br /> FROM: Craig Walters <br /> SUBJECT: Waste Treatment Closure Plan <br /> Waste Treatment Closure Plan <br /> Onsite closure plan; waters containing hexavalent chrome. <br /> 1) Waste will be treated according to Waste Analysis Plan. <br /> 2) Unit can be closed at any time at direction of management. <br /> 3) Maximum inventory of waste in storage and in treatment at any time of operations <br /> of this unit is expected to be 135 gallons. <br /> 4) Procedure for decontamination: rinsing the tanks until rinse water is clear. Rinse <br /> water must be treated as per waste analysis pian. <br /> 5) There is no expected year of closure. <br /> 6) Time estimated to close this unit is 20 man hours to prepare chrome sludge and <br /> one 55 gal drum shipped to hazardous waste, a cost of appox., $1,000.00 <br /> P:\PF Safety&Environmental\Enviro\Water\Waste Treatment Closure Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.