Laserfiche WebLink
Premier COatings, <br /> �l T <br /> ic DBA <br /> ATIN FOR MANUFNC <br /> Premier Finishing <br /> 7910 Longe St. <br /> Stockton, Ca 95206 <br /> Ph 209-982-5585 Fax 209-983-4050 <br /> Email:David@premierfinishing.com <br /> January 9,2015 <br /> TO: Environmental Health Dept. <br /> FROM: Craig Walters <br /> SUBJECT: Waste Treatment Closure Plan <br /> Waste Treatment Closure Plan <br /> Onsite closure plan; waters containing hexavalent chrome. <br /> 1) Waste will be treated according to Waste Analysis Plan. <br /> 2) Unit can be closed at any time at direction of management. <br /> 3) Maximum inventory of waste in storage and in treatment at any time of operations <br /> of this unit is expected to be 135 gallons. <br /> 4) Procedure for decontamination: rinsing the tanks until rinse water is clear. Rinse <br /> water must be treated as per waste analysis pian. <br /> 5) There is no expected year of closure. <br /> 6) Time estimated to close this unit is 20 man hours to prepare chrome sludge and <br /> one 55 gal drum shipped to hazardous waste, a cost of appox., $1,000.00 <br /> P:\PF Safety&Environmental\Enviro\Water\Waste Treatment Closure Plan <br />