Laserfiche WebLink
f <br /> Premier Finishing <br /> ° Waste Water Discharge Pei-rnit <br /> Part C -Schematic F0®W Diagram. <br /> Process#1 <br /> - 1 <br /> Proposed overflow rinse at 6 gallons per minute. I--------------------t Outgoing <br /> I PH Monitoring/Testing/Control+Oil skimmer I-• Waste Water � <br /> I <br /> t <br /> t <br /> 1 TANK 1 TANK 2TANI<3 (TANK 4 . TANK 5 TANK 6 TANK 7 TANK 8 TANK 9 �TANK 10 TANK 11 <br /> ABCO- i_. AIuma'ie Running Deoxidizer Running Macdermid Stagnant Spray& Sump Hot Water Holding <br /> AC2 Running Etch Rinse 710 Rinse 142, Rinse Running lump Rinse Tank � <br /> Rinse Rinse <br /> �TANK 1.2 m <br /> - .- - -' - <br /> �t l <br /> ContainmentUlTalO�= <br /> 3'4`U x 5`L;:4`D Tans <br /> 3' Wx5' Lx3' D Tanks <br /> Tank#1 ARCO-AC2:Batch treatment test and discharging a Tank volume approximately 350 gallons(@ 7.48 gallons/ft3) <br /> g g pprox 1 time per year. <br /> Tank 13 A;umate Etch:Batch treatment,test and discharging approx 1 time per year. 4 tanks x 350 gallons=1,400 gallons released per day. <br /> Tank#5 Deoxidizer 710:Batch treatment,test and discharging approx 1 time per year. <br /> Tank*7 Macdermid 142,When spent will be sent away as hazardous waste. Tans 2,4,6,9 8:10 are running rinses. <br /> Tank e8 When spent wfll be sent away as hazardous waste.(We have a quote with Foss Environmental.) <br /> Tank#9 Rinse water is used to recharge Tank 8. <br /> Tank#12 Collection/Sump pump to transfer to waste water holding tanks(on south side of bldg process#2) <br /> pfpdc\\cAenviro\adobe\aBodiine tankline layoutsaunall.ai <br />