Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer "dustry Standard ❑ <br /> Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Uses: 9&ressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Speci ) <br /> Measunng Eqxupment Used for Testing: 1 v c <br /> _ <br /> Piping Run# Pi ing Run# _ Piping' — <br /> Ran# <br /> Piping Material: C� <br /> Piping Manufacturer: /T tA <br /> Piping Diameter: _ it <br /> Length of Piping Run: T <br /> Product Stored: t7 <br /> Method and location of piping- un isolation: D <br /> Wait time between appl i�gn r surefvacuum/ ter and startin est: 5 <br /> Test Start Time: Z?' <br /> Initial Reading(RI): 5.i <br /> Test End Time: -- <br /> Final Reading(RF): S + <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold: <br /> Test Result: /� 5 <br /> Comments - (include information on repairs made prior to testing) <br />