My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_1987 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:25:20 PM
Creation date
1/10/2020 12:00:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2005
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Height from UDC Bottom to Hi est Pi in Penetration: <br /> Height from UDC Bottom to Lo est Electrical Penetration: <br /> Condition of UDC prior to to <br /> Portion of UDC Tested _ <br /> Does turbine shut down when C sensor detects either product or water? <br /> Turbine shutdown response time <br /> Is sygem programmed for fail-sa a shutdown? <br /> Was fail-safe verified to be o 'ona17 _ <br /> Wait time between applying pres acuum/water and startingt <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold: <br /> Test Result: <br /> Was sensor removed for ? <br /> Was sensor properly laced aftor testis <br /> Comments- (include information on repairs made prior to testing) <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Test Method Developed ❑Sump Manufacturer ❑Industry Standard 10 <br /> Professional Engineer _ <br /> ❑Other(S ci ) <br /> Test Method Uses: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(S ci ) <br /> Measuring Equipment Used for Testing: <br /> Fill Sump# Fitl Sump# Fill Sum <br /> Sump Diameter: <br /> Sump Depth: <br /> Height from Tank Top to Hi t Piping Penetration: _ <br /> Height from Tank Top to Lowest Electrical Penetration: <br /> Condition of mmp prior to testis : <br /> Portion of Smp Tested <br /> Sump Material: <br /> Wait time between applying-jr—esWrelvacquWwater and starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br />
The URL can be used to link to this page
Your browser does not support the video tag.