My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_1987 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:25:20 PM
Creation date
1/10/2020 12:00:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2005
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> r <br /> F.' In-Tank Gauging/ SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> C�Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com Tete the following checklist: <br /> ❑ Yes ❑ No* Has all input .viring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested'? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or«•ill be corrected. <br /> G. Line Leak Detectors (LLD): heck this box if LLDs are not installed. <br /> Cor: icte the folloNN g checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apph) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h . ❑ 0.2 g.p.h. <br /> ❑ Yes O No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes Cl No* Was the testing apparatus properly calibrated? <br /> ❑ Yes O No* For mech-=ical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes O No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> O Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> O N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs. have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> O Yes 1 ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.