Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department, (209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITY NAME S7- SEgitGr S DATE_ <br /> FACILITY ADDRESS 3 S7>S /UA cau D2 S7,,T � CA <br /> l.Name(s)and Title(s) of the people responsible for performing the monitoring and/or maintenance <br /> t <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS PIPING <br /> 3.Describe the location(s) of where the monitoring will be performed. ie: location of sensors <br /> .N) oFptcii e-4- . <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel WX <br /> Name and Model of Line Leak Detectors uta <br /> Name and Model of Annular Sensors NAA- <br /> Name and Model of Piping Sensors <br /> Name and Model of Dispenser Sensors <br /> Type of overfill prevention <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes❑ No❑ <br /> Does the turbine shut down if a sensor is disconnected? Yes[I No❑ <br /> Does the turbine shut down is the monitoring panel loses power? Yes❑ No❑ <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> Da,C <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? I%PZt, <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system, including piping, and the monitoring <br /> equipment. <br /> 1:vmtemi-le\USZ\mon itoringplan.doc <br /> it24noo2 <br />