My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_1987 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:25:20 PM
Creation date
1/10/2020 12:00:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2005
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address Date of Testing/Servicing: j <br /> F. (n-'rank Gauging/SIR Equipment: C3,5beck this box if tank gauging is used oniv for►mentory control. <br /> ET Check this box if no tank gauging or SIR equipment is insallled. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the ioilewio&checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination. including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly'? <br /> ❑ Yes ❑ No* j Were all items on the equipment manufacturer's maintenance cfux*I st completed? <br /> In the Section H,below,describe how and when these deficZChcck"tmhis <br /> or will be corrected. <br /> G. Line Leak Detectors (LLD): box if LLDs are not installed. <br /> Complete the ing check isL <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification. was a leak simulated to verify LLD performance'' <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑ 3 g p.h.'-, ❑0.1 g.p.h 2-, ❑ 0.2 g.p.h.` <br /> Notes: l. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus property calibrated? <br /> ❑ Yrs 'J' No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> n Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if am portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLD& does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test'? <br /> ❑ Yes ❑ No* For electronic LLDs, have ail accessible wiring connections been yrtsually inspected:' <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> ' In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.