Laserfiche WebLink
,JUL-11-2011 10:49 Service Station Systems 408 938 8888 P.04 <br /> Monitoring System Certification-Page 3 of 3 <br /> Site Address: 3505 Navy Dr. Date ofTesting/Servicing: 6/27111 <br /> F. In-Tank Gauging/SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the fall ing checklist.. <br /> O Yes 13 NO Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> 0 Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> 0 Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes 0 No* Were all probes reinstalled properly? <br /> 0 Yes 1 0 No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> C. Line Leak.Detectors(LLD): J Check this box if LLD's are not installed. <br /> Com tete the following checklist: <br /> ❑ Yes 0 No* For equipment start-up or annual equipment certification was a leak simulated to verify L1..13 performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ❑ 3 g.p.h. (1.); 0 0.1 g.p.h. (2.); ❑ 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local a enc ,certification required only for electronic LLD start-up. <br /> 0 Yes p Nos Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> 1J Yes ❑ No* Was the testing apparatus ro erl calibrated? <br /> ❑ Yes 0 No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> 0 N/A - <br /> 0 Yes ❑ No* For electronic LU)'s,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> 0 Yes ❑ No* For cicetronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> 0 Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ❑ Yes 0 No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> 0 Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments. Tank monitored by a sensor. <br />