Laserfiche WebLink
Software Version installed: oe <br /> Complete the following checklist: <br /> & Yes ❑ No* Is the audible alarm operational? <br /> IN Yes ❑ No* Is the visual alarm operational? <br /> ® Yes ❑ No* Were all sensors visually insWctedjunctionally tested,and confirmed operational? <br /> M Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ® N/A operational? <br /> ❑ Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> 9 N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to Idaks and sensor failure/disconnection? ❑Yes; ❑No. <br /> ® Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what.percent of tank capacity does the alarm trigger? <br /> ❑ Ye= Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> UP Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set tip reports,if applicable <br /> l Yes ❑ No* Is all monitoring a ui mentoperational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03/01 <br />