Laserfiche WebLink
Site Address: Date ofTesdugr;euvicing: <br /> F. In-Tank Gauging/$II2 Equipment: ❑ Check this box if tan- gauging is used only-for irrventory corruat. <br /> ❑ Check this box if no tank,gauging or SIR equipment is installed" <br /> This section must be completed if in-tank gAli.��egtapnPert is used to perform leak detection monitoring. <br /> Complete the following checklist <br /> ❑ T Has all input wiring been" for g g ground faults? <br /> wed Pte— a=te lir=atiorL including testing for <br /> ❑ Yes ❑ No* Wer - ' g probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system p dings tested? <br /> ❑ Yes ❑ No* Was accuracy of system mater level readings test l <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance che&hst completed? <br /> In the Section H,below, describe how and when these deficiencies were orwill be corrected- <br /> G. Line Least Detectors (LLD): 2"theck this box if LLDs are Lot in,LecL <br /> Complete the following checklist: <br /> es ❑ No* For equipment start-up or annual equipment certification- was a Ieak simulated to verify LLD perforn <br /> N/A_ (Check all that apply) Simulated leak rale_ ❑:a.p-h_'- ❑0.1 a p.h-''- ❑02 &p-h-2 <br /> Notes: 1. Required for equipment st<st-ap certificati-o3 z-d ar=�—j cert=5c;tion_ ! <br /> 2. Unless mandated by local apency.certificatioa required only fc)r elcciLp is LID stmt-up. � <br /> ❑ Yes ❑ No* Were aftLQs confirmed operational and accurate Within regulatory rertuirements? <br /> ❑ Yes ❑ Nom Was the testing ap tus properly cahbraied? <br /> ❑ Yes ❑ No* For mechanical LL Ds doe LLD rasirict product flois,if it detects a leaf? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine auto shui of if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No= For electronic LLDs, does the turbine automaticaily shut e_ ' a y portion•of the moruto.ing syste_n is di-bled I <br /> ❑ N/A or disconnected`? <br /> ❑ Yes ❑ No* For electronic LLDs. does the turbine automatically shut off if any on of the mortiPoring syste <br /> ❑ N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accesis�-ble vv-irina connections been ti,risuall iuspted? <br /> ❑ N/A i <br /> ❑ Yes ❑ No* Were all items on the equipment manuf2cim-er's maiintenance checklist completed? <br /> In the Section€l, below,describe how and when these deficiencies were or will he corrected. <br /> IBI. Comments. <br /> Page 3 of 3 <br /> Q3101 <br />