My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3505
>
2300 - Underground Storage Tank Program
>
PR0231848
>
COMPLIANCE INFO_2006 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:33:46 PM
Creation date
1/10/2020 1:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2018
RECORD_ID
PR0231848
PE
2361
FACILITY_ID
FA0002052
FACILITY_NAME
NuStar Terminals Operations Partnership L.P.
STREET_NUMBER
3505
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203004
CURRENT_STATUS
01
SITE_LOCATION
3505 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209)468-3433 Web:www.sjgov.org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> NUSTAR ENERGY LP 3505 NAVY DR STOCKTON May 03 2016 <br /> UST System Observations <br /> 321 CCR 2636(c)(1) All releases in secondary piping do not flow to a collection sump ❑V ❑R ❑COS <br /> 322 CCR 2636(f)(2) Line leak detector not installed ❑V ❑R ❑COS <br /> 323 CCR 2636(f)(2) Leak detector failed to detect a 3.0 gph leak at 10 psi ❑V ❑R ❑COS <br /> 324 CCR 2635(b) No spill bucket installed or failed to provide a means to keep it empty ❑V ❑R ❑COS <br /> 325 CCR 2635(b) Spill container failed to contain a minimum capacity of five gallons ❑V ❑R ❑COS <br /> 326 CCR 2635(b)(2) Overfill prevention system not present or failed to meet overfill requirements ❑V ❑R ❑COS <br /> 327 CCR 2635(b)(2) Overfill prevention was overridden ❑V ❑R ❑COS <br /> 328 HSC 25283.5 Unburied below grade UST failed to meet exemption status ❑V ❑R ❑COS <br /> 329 CCR 2717.1(g) Tampered with red tag ❑V ❑R ❑COS <br /> 330 CCR 2717.1(f) Deposited petroleum into a red tagged UST ❑V ❑R ❑COS <br /> 331 HSC 25299(f)(2) Tampered with or disabled leak detection devices or alarms ❑V ❑R ❑COS <br /> 332 CCR 2631.1 UST system not compatible with the substance stored ❑V ❑R ❑COS <br /> 333 HSC 25298(b) Failed to comply with temporary closure requirements ❑V ❑R ❑COS <br /> 334 HSC 25298(c) Failed to comply with permanent closure requirements ❑V ❑R ❑COS <br /> Non-Pressurized Piping <br /> 401 CCR 2636(a)(3) Suction piping not properly sloped or incorrectly located check valve ❑V ❑R ❑COS <br /> 402 CCR 2643(d) Daily monitoring of suction pipe(pre-Jan 1984)not performed ❑V ❑R ❑COS <br /> 403 CCR 2643(d) Triennial 0.1 gph line test for conventional suction piping not performed(pre-January 1984) ❑V ❑R ❑COS <br /> 404 CCR 2643(e) Biennial 0.1 gph test for gravity piping not performed(pre-January 1984) ❑V ❑R ❑COS <br /> Other Violations <br /> 2010 See below Unlisted Administration/Documentation violation ❑V ❑R ❑COS <br /> 2030 See below Unlisted Operations/Maintenance violation ❑V ❑R c COS <br /> 2060 See below Unlisted Design/Construction violation ❑V ❑R c COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> Overall Inspection Comments: <br /> No violations noted at this time. <br /> Please be aware that as of January 1, 2014, facility operators are required to upload the following UST program <br /> documents into the California Environmental Reporting System (CERS): UST Monitoring Site Plan, UST <br /> Certification of Financial Responsibility, UST Response Plan, UST Letter from Chief Financial Officer (if <br /> applicable), and the Owner Statement of Designated Operator Compliance. The UST Owner/Operator: Written <br /> Agreement, if applicable, can be stored at the facility or uploaded into CERS. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.