Laserfiche WebLink
HEGHVEL� <br /> JUN 12 2015 <br /> 1.FACILITY INFORMATION °IVIRONMENTAL <br /> Facility Name: Nu Star Energy Date of Testing: 5/12/15 <br /> Facility Address: 3505 Navy Drive,Stockton CA 95206 <br /> Facility Contact: I Phone: (209)943-5562 <br /> Date Local Agency Was Notified of Testing:5/4/15 SB989–3yr.Compliance Test <br /> L.Name of Local Agency Inspector(/f present during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name:ABLE Maintenance,Inc. <br /> Technician Conducting Test: James Moore/I.C.C.#5254517-UT <br /> Credentials: ® CSLB Licensed Contractor SWRCB Licensed Tank Tester <br /> License Type::1,B,Haz.,C10 License Number: 3128.34 <br /> Manufacturer Training <br /> Manufacturer _ Component(s) bate Training Expires <br /> Available upon request <br /> 3. SUMMARY OF TEST RESULTS <br /> Not Repairs Not Repairs <br /> Component: Pass Fail Component: Pass Fail <br /> Not <br /> Made Tested Made <br /> Tank 1 Annular ❑ I ❑ i ❑ <br /> - —' <br /> Secondary Product 1 IE n [] El <br /> . <br /> Secondary Product 2 % E ' L I L ❑ E <br /> Turbine Sump I ❑ ❑ ❑ <br /> Iv <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Used pump test truck <br />