Laserfiche WebLink
CvvATC <br /> • <br /> A S S D C I A T E S I N C <br /> Re ort Pre arat�on <br /> Upon completion of the well installation and development activities, a summary report will be <br /> prepared for submittal to PHSIEHD The report will include a description of all field activities, <br /> laboratory analytical results, and well/boring logs <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer All work will be performed in accordance with ATC's Site <br /> Safety Plan (SSP) and Quality Control/Quality Assurance Plan, which are on file for this site <br /> with PHSIEHD <br /> Projected Schedule <br /> Once approval of this workplan has been received, ATC will schedule drilling activities ATC <br /> will notify PHSIEHD at least 48 hours prior to beginning any field activities Drilling activities <br /> have been tentatively scheduled for November 17 and 18 or December 14 and 15, 1999 The <br /> summary report will be submitted to PHSIEHD approximately four to five weeks after the <br /> completion of field activities <br /> • If you have any questions or require additional information regarding this workplan, please <br /> contact us at (209) 579-2221 <br /> Respectfully submitted, <br /> ATC Associates Inc <br /> V <br /> Drew Van Allen <br /> Project Manager <br /> { <br /> J NCID <br /> Jeanne Homsey, P E <br /> Registered Engineer No C47410 <br /> Attachments CRU <br /> vO <br /> cc Ms Lori Shields, Diesel Performance Inc <br /> w 1625771reportslwkpwe1s doe 4 <br />