My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011267
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2804
>
3500 - Local Oversight Program
>
PR0545172
>
ARCHIVED REPORTS_XR0011267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:58:32 AM
Creation date
1/13/2020 10:52:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011267
RECORD_ID
PR0545172
PE
3528
FACILITY_ID
FA0009349
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2804
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14343001
CURRENT_STATUS
02
SITE_LOCATION
2804 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> . Smith Technolo si-rE sA��r>�v <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection 1s required on all Smith Technology worksites Level D <br /> includes: <br /> •� Steel toed boots <br /> Safety Glasses <br /> Hard Hat <br /> For each task on this project, identify additional protective garments as required, include the <br /> conditions under which the level of PPE would be modified for each task <br /> Task(s) Condition Personnel Garment(s) <br /> Working Near Vehicle Orange Vests <br /> 1 >20 ppm for 5 minutes in Face Respirator <br /> 1 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all Smith Technology hazardous waste sites <br /> Site will be secured as follows, Fencing will be used when possible <br /> Work Zones will be marked as follows. Orange cones or barricades and caution tape will be <br /> used to mark off work zone where traffic is present. <br /> MARK WORK ZONES ON SITE MAP L7 CHECK WHEN DONE. <br /> • <br /> PACE 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.