Laserfiche WebLink
E W gent List <br /> ' VES Trailer <br /> ' Generator ( UR) <br /> ' • Vapor well connections 2" <br /> ' Magnehelic gauges - set <br /> • <br /> PID/CVA (Gastech) <br /> ' • Air sample pump <br /> • Water level indicator <br /> • Well caps with monitoring ports <br /> Materials List <br /> • Sample bottles <br /> • Summa canisters <br /> • Sailers <br /> ' • Gloves <br /> • Vacuum, PSI, and temperature gauges <br /> ' • Pitot tube with fittings, anemometer <br /> • Misc piping and connectors, flexible piping <br /> VAPOR EXTRACTION TEST <br /> On November 29, 2004 Alex and Charlie will mobilize to the site in the morning <br /> ' Take barricades and traffic cones <br /> November 29, 2004 <br /> Pre-test Procedures <br /> • Measure depth-to-water in extraction well (MW2) and all observation wells (VWE1, <br /> VWE2, MW1, 3 & 4) <br /> ' • At extraction wellhead MW2, install PVC riser and all piping to connect to VES trailer <br /> • Install picot tube gauges, temperature gauge, etc for monitoring influent stream <br /> • Install monitoring caps on all observation wells, hookup magnehelic gauges set to zero <br /> • Record vacuum or pressure readings at all monitoring points prior to testing <br /> • Collect GW sample prior to start VET <br /> AlexF Dieselvet <br />