Laserfiche WebLink
F�ZI�w^_eIIt T iSt <br /> ' VES Trailer <br /> • Generator ( UR) <br /> • Vapor well connections 2" <br /> • Magnehelic gauges - set <br /> • PID/CVA (Gastech) <br /> ' • Air sample pump <br /> • Water level indicator <br /> • Well caps with momtonng ports <br /> Materials List <br /> ' • Sample bottles <br /> • Summa canisters <br /> • Bailers <br /> ' • Gloves <br /> • Vacuum, PSI, and temperature gauges <br /> ' Pitot tube with fittings, anemometer <br /> • Misc piping and connectors, flexible piping <br /> VAPOR EXTRACTION TEST <br /> On November 29, 2004 Alex and Charlie will mobilize to the site in the morning <br /> ' Take barricades and traffic cones <br /> November 29 2004 <br /> Pre-test Procedures <br /> ' . Measure depth-to-water in extraction well (MW2) and all observation wells (VWE1, <br /> VWE2, MWI, 3 &4) <br /> • At extraction wellhead MW2, install PVC riser and all piping to connect to VES trailer <br /> ' Install pitot tube, gauges, temperature gauge, etc for monitoring influent stream <br /> • Install monitoring caps on all observation wells, hookup magnehelic gauges set to zero <br /> t Record vacuum or pressure readings at all momtonng pomts prior to testing <br /> Collect GW sample pnor to start VET <br /> A1exF Dieselvet <br />