My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011513
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2804
>
3500 - Local Oversight Program
>
PR0545172
>
ARCHIVED REPORTS_XR0011513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 11:57:42 AM
Creation date
1/13/2020 11:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011513
RECORD_ID
PR0545172
PE
3528
FACILITY_ID
FA0009349
FACILITY_NAME
DIESEL PERFORMANCE INC
STREET_NUMBER
2804
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14343001
CURRENT_STATUS
02
SITE_LOCATION
2804 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F�ZI�w^_eIIt T iSt <br /> ' VES Trailer <br /> • Generator ( UR) <br /> • Vapor well connections 2" <br /> • Magnehelic gauges - set <br /> • PID/CVA (Gastech) <br /> ' • Air sample pump <br /> • Water level indicator <br /> • Well caps with momtonng ports <br /> Materials List <br /> ' • Sample bottles <br /> • Summa canisters <br /> • Bailers <br /> ' • Gloves <br /> • Vacuum, PSI, and temperature gauges <br /> ' Pitot tube with fittings, anemometer <br /> • Misc piping and connectors, flexible piping <br /> VAPOR EXTRACTION TEST <br /> On November 29, 2004 Alex and Charlie will mobilize to the site in the morning <br /> ' Take barricades and traffic cones <br /> November 29 2004 <br /> Pre-test Procedures <br /> ' . Measure depth-to-water in extraction well (MW2) and all observation wells (VWE1, <br /> VWE2, MWI, 3 &4) <br /> • At extraction wellhead MW2, install PVC riser and all piping to connect to VES trailer <br /> ' Install pitot tube, gauges, temperature gauge, etc for monitoring influent stream <br /> • Install monitoring caps on all observation wells, hookup magnehelic gauges set to zero <br /> t Record vacuum or pressure readings at all momtonng pomts prior to testing <br /> Collect GW sample pnor to start VET <br /> A1exF Dieselvet <br />
The URL can be used to link to this page
Your browser does not support the video tag.