My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2911
>
2900 - Site Mitigation Program
>
PR0535086
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 1:20:29 PM
Creation date
1/13/2020 1:13:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535086
PE
2953
FACILITY_ID
FA0020278
FACILITY_NAME
UNITED RENTALS
STREET_NUMBER
2911
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14308057
CURRENT_STATUS
01
SITE_LOCATION
2911 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 WORK PLAN OBJECTIVES <br /> The work plan objective consists of the following: <br /> ' 1. Remove concrete flooring, the inactive clarifier, and associated piping and excavate, to <br /> ' the extent possible, contaminated soil beneath the inactive clarifier. <br /> 2. Temporarily store excavated material on site, west of the existing building pending <br /> ' characterization of the stockpiled soil. <br /> 3. Collect confirmation soil samples from the floor of the excavation to evaluate the nature <br /> ' of residual contamination remaining after excavation activities. <br /> 4. Mitigate physical hazards of an open excavation by backfilling the excavation with <br /> imported pea gravel and/or engineered fill, as appropriate, repairing any subsurface sewer <br /> ' laterals related to removing the clarifier, and restoring the ground surface with new <br /> concrete flooring . <br /> ' 5. Characterize the stockpiled material through laboratory analyses to evaluate remediation <br /> and/or disposal options. <br /> ' 4.0 SCOPE OF WORK <br /> All sampling and field work on this project will be conducted under the direction of John <br /> ' Lane, a Professional Geologist registered by the State of California. Lee & Pierce will define the <br /> area to be excavated and notify of Underground Service Alert prior to the start of field work. <br /> Del-Tech Geotechnical Support (Del-Tech), a State-licensed hazardous waste contractor <br /> ' (Contractor License #657366 A/HAZ), will conduct excavation and backfill activities in <br /> compliance with applicable laws and accepted field practices. Del-Tech, under the direction of <br /> ' Lee & Pierce,will remove as much impacted soil as is practical, given the constraints dictated by <br /> site conditions, as the area to be excavated lies within an existing storage warehouse. We <br /> ' anticipate the maximum depth of practical excavation will be approximately 18-20 feet. We <br /> have estimated that approximately 200 cubic yards of soil will be excavated. Del-Tech will <br /> utilize an excavator, if possible, or a back-hoe, if space dictates, to conduct the excavation, and a <br /> ' SOIL REMOVAL WORKPLAN[041131111 3 LEE&PIERCE INC. [JOB#107591 <br />
The URL can be used to link to this page
Your browser does not support the video tag.