My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
3246
>
3500 - Local Oversight Program
>
PR0545174
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 2:29:52 PM
Creation date
1/13/2020 2:08:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545174
PE
3528
FACILITY_ID
FA0004965
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
3246
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14341001
CURRENT_STATUS
02
SITE_LOCATION
3246 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron U.S.A. Inc. <br /> Site, Safety plan <br /> October 2, 1991 <br /> d. Summary: Do not enter the confined space unless: <br /> ® the oxygen cone(antration is between 19.5 and 23%; <br /> 9 the LEL is less than 20%; <br /> • PID and/or FID readings are less than 750 ppm (a half <br /> face respirator must be worn above 50 ppm; a full face <br /> respirator must be worn if the readings exceed 100 ppm) <br /> e. Buddy System: The buddy system must be used when the work <br /> in the confined space: (1) requires the perron's head to <br /> be below ground level; or (2) the person must work in a <br /> manhole or other space in which an exit may not be easily <br /> accessible. <br /> TABLE Il <br /> HAZARD SUMMARY <br /> PPE AIR MONITORING - BREATHING ZONE <br /> Job Task Level <br /> Instrument Frequency* <br /> Soil boring At start of work and <br /> samples A PID or FID 15 min to continuously <br /> Monitoring D PID or FID At start of work and <br /> Well Installation 15 min to continuously <br /> Monitoring D PID or FID Start--up of work at each <br /> Well Survey well location <br /> Monitoring D PID or FID Start-up of work at each <br /> Well Development well location <br /> Groundwater D PID or FID Start-up of work at each <br /> and soil sampling well location. <br /> All air monitoring data must be recorded on the 'Vapor Monitoring Sheet, <br /> Appendix H. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.