Laserfiche WebLink
ly <br /> Chevron U.S.A. Inc. <br /> Site Safety Plan <br /> October 2, 1991 <br /> 9.4 rmer4ency Equipment <br /> Vehicles used for site work will be equipped with a first aid kit and <br /> safety equipment including: <br /> 4 fluorescent vests, <br /> 4 cones, <br /> 4 flags (as needed) <br /> + barricades (as needed) <br /> + fire extinguisher-dry :heroical ABC-type extinguisher, <br /> 4 flashlight, <br /> 4 water, suitable for drinking, <br /> portable eye wash, <br /> 0 appropriate emergency bandage material. <br /> 9.5 carbon Treatment <br /> If this site involves the use of a Carbon Treatment System, then the <br /> following information will apply. <br /> The Carbon Treatment System is equipped with an emergency shut-off. <br /> The system will shut off automatically when the non-methane TPH vapor <br /> concentrations in the intermediate line reach 5t of the Lower Explosive <br /> Limit (LEL) for gasoline as recorded by the system monitors. <br /> The suggested equipment for decontamination and spill response <br /> procedures includes: <br /> # wash tubs (3) <br /> # plastic sheets <br /> # trash bags <br /> + scrub brushes <br /> + detergent <br /> + sorbent booms (as applicable) <br /> The carbon system is a closed system where no chemicals are used. The <br /> potential for a spill is minimal and thus spill containment is not <br /> addressed in this Site Safety Plan. <br /> 9.6 Drillinc <br /> i Procedures <br /> A Dig-Alert authorization number must be obtained prior to drilling. <br /> During the drilling operation, two persons (one designated as "driller" <br /> and the other as "helper") must be present at all times. The helper <br /> (whether Groundwater Technology, Inc. personnel or subcontractors) must <br /> be instructed as to the location of the emergency shut-off switch. <br /> Every attempt must be made to keep unauthorized personnel from entering <br /> the work area. If this is not possible, the operation should be shut <br /> down until the area is cleared. The area where the operation is taking <br /> place shall be cordoned off with a barricade. The Site Safety Officer <br /> or the Field Team Leader has the authority and the responsibility to <br /> 21 <br />