Laserfiche WebLink
Soil is removed from the other two liners and examined. The soil is scanned wial a Foxboro <br /> Century 128 organic vapor analyzer(FID). OVA readings are noted on the logs. The sails are <br /> also described and classified according to the Unified Soil Classification System. <br /> Soil samples are delivered, under chain of custody, to a laboratory certified by the California <br /> Department of Health Services(DHS) for hazardous materials analyses. The samples are a- - <br /> lyzed for petroleum hy(L-ocarbons according to recommendations of Table 2 of the "Tri-Regie a Al <br /> Recommendations." <br /> C.3 WELL INSTALLATION <br /> The boreholes are completed as groundwater monitoring wells after drilling. The wells are con- <br /> structed of 4-inch-diameter Schedule 40 PVC flush-threaded casing. The screened interval <br /> consists of 0.010 or 0.020-inch slotted casing,placed from 10 to 15 feet below the water table to <br /> about 5 feet above it. A threaded end plug or a slip cap secured with a stainless steel screw is <br /> placed on the bottom of the well. <br /> A filter pack of clean No.2/16 Lonestar,#3 Monterey,or equivalent sands is placed in the annu- <br /> lar space around the well screen to approximately 2 feet above the top of the screen. The sand is <br /> sealed with a Bentonite plug 1-2 feet thick and hydrated with deionized water. A surfw:e seal is <br /> then created by placing a cement grout containing less than 5 percent Bentonite from the clay te, <br /> the surface with a Tremie pipe o:grout pump. <br /> The well is secured from unauthorized entry on the surface in a slightly raised, 12-inch-diameter i <br /> traffic-rated, water-tight steel traffic box that requires a special wrench to open. The traffic box <br /> is set in concrete. The well is further secured from unauthorized entry with a locking well ca;). <br /> A proposed well completion is shown in .Figure C-1. <br /> CA WELL DEVELOPMENT <br /> The wells are developed two days after completion. Development consists of surging the <br /> screened interval of the well with a 4-inch flapper valve surge block for approximately 15 <br /> minutes. The well is then purged, with a submersible electric pump, centrifugal pump, air-lift <br /> pump,or PVC bailer of 2-6 casing volumes of water. The surging and pumping is repeated until <br /> the water is free of silt and apparent turbidity, for a maximum.of 4 hours. <br /> A record of the purging methods and volumes of water purged is maintained. All purge water is <br /> contained on the site in properly labeled 55-gallon drums. Purged water is disposed of at an <br /> appropriate facility on the basis of the laboratory analytical results. <br /> c67/97780/apc C-2 <br />