My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011478
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
3246
>
3500 - Local Oversight Program
>
PR0545174
>
ARCHIVED REPORTS_XR0011478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2020 3:27:54 PM
Creation date
1/13/2020 2:35:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011478
RECORD_ID
PR0545174
PE
3528
FACILITY_ID
FA0004965
FACILITY_NAME
CHEVRON USA (INACT)
STREET_NUMBER
3246
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14341001
CURRENT_STATUS
02
SITE_LOCATION
3246 E FREMONT ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> C.5 WELL SURVEY <br /> The elevation of the top of the well casing is surveyed relative to an established datum using a <br /> Lietz C-3 automatic level and stadia rod. A small notch is cut in the top of the well casing to <br /> mark the survey point, to ensure that this point is used for all future water level measurements. <br /> A loop originating and ending at the datum is closed to 10.01 feet according to standard methods <br /> described by Brinker and Wolfe (1977). <br /> CA k iROUNDWATER SAMPLING <br /> The new wells are sampled no less than 24 hours after well development. <br /> C.6.1 Sg_mplingEquipment Preparation <br /> All well measurement and sampling equipment are constructed of inert material whenever possi- <br /> ble. Sampling bailers are constructed of Teflon. Stainless steel submersible or airlift pumps, <br /> surface centrifugal pumps with dedicated polyethylene tubing,or PVC bailers are used to purge <br /> the well prior to sampling.depending on depth to water. All sampling equipment is decortami- <br /> nated in the following manrer prior to introduction into each weil: <br /> 1. Bailers, pumps, suspension rope and lines, and well sounding tapes are <br /> rinsed thoroughly with clean,fresh water to remove dust and dirt. <br /> 2. All equipment is cleaned with Al( anox detergent and deionized inside and <br /> out. The equipment may be cleaned offsite and stored and transported in <br /> steam-cleaned and protected inert containers. Fluids used to decontaminate <br /> equipment on the site is stored with other purge ware*., Nitrile gloves are <br /> worn at all times during sample equipment cleaning, handling, and sample <br /> collection. <br /> 3. All equipment is thoroughly rinsed with deionized (DI) water immediately <br /> after cleaning. <br /> 4. All equipment is thoroughly rinsed with DI wzter twice before insertion into <br /> a well. <br /> 5. Bailers and pumps are suspended on clean, DI-water-rinsed polypropylene <br /> rope. The rope is discarded after each well. <br /> C.6.2 Presampling Measurement <br /> Prior to purging and sampling of each well, the depth to standing water and the total depth of the <br /> well is measured with a decontaminated optical interface probe. A decontaminated, clear acrylic <br /> bailer is then inserted into the well to just below the static water level and removed to confirm <br /> the presence/absence of any floating product. These presample measurement data are recorded <br /> on a Record of Well Gauging and Purging and used to calculate the volume of standing water in <br /> e67/97780/ape C-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.