My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7679
>
2231-2238 – Tiered Permitting Program
>
PR0539057
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2020 11:42:52 AM
Creation date
1/14/2020 9:57:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0539057
PE
2237
FACILITY_ID
FA0014430
FACILITY_NAME
Aramark Uniform & Career Apparel, LLC-Stockton
STREET_NUMBER
7679
STREET_NAME
LONGE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
7679 LONGE ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At conclusion of WW discharge each day, turn all identified equipment to "OFF". <br /> Record daily WW discharge totalizer reading upon completion of each operating <br /> day after validating zero flow. <br /> Unplug power to pH acid pump at end of operating day. <br /> System Operating Parameters: <br /> Wastewater chemical dosages should be based on the following operating <br /> parameters at flowrate of approximately 250 gpm. Adjustments can be amended <br /> based on flowrate: <br /> Coagulant CL 1267- 450 ppm <br /> PolyClear 390- 300 ppm <br /> Flocculant CE 8801- 15 ppm <br /> Perform chemical draw-downs to verify dosages and to ensure clarity wedge is <br /> maintained a level of 30-40 clarity units. <br /> Dewatering products for filter press operation are based on the following <br /> operating parameters after performing liquid filterability testing and water wicking <br /> from hand drain simulation test or "towel-test". Normal standards for product <br /> addition: <br /> Perlite filter aid- 10-15 bags <br /> Bentonite clay- 1-2 bags (only as needed) <br /> Upon completion of sludge conditioning close press and ensure hydraulic <br /> clamping pressure of 3,500 psi. Open inlet sludge feed valve to press and all <br /> filtrate lines. Press start on filter press control panel to initiate "APC" operation <br /> for sludge pump. Typical operational stages are in 25 psi increments, with <br /> completion at maximum of 100 psi. This process is normally complete within 2 <br /> hours. <br />
The URL can be used to link to this page
Your browser does not support the video tag.