Laserfiche WebLink
SEP-13-96 FRI 16:35 EMCON Associates. 408+4537300 P. 02 <br /> 0 EMCOR <br /> 1921 Ringwood Avenue•San Jose,Calltornia 95131-1721 •(408)453-7300•Fax(408)437-9526 <br /> September 13, 1996 <br /> Project 22074-001.001 <br /> Ms.Mary Ways <br /> San Joaquin Public Health Services <br /> 445 North San Joaquin Street <br /> Stockton,California 95201 <br /> Re: Well Destruction,Former former Nestle USA Distribution Center,4343 East <br /> Fremont Street,Stockton,California <br /> Dear Ms. Meays: <br /> This letter confirms the destruction of Well MW-1 which was located at the former Nestle <br /> USA Distribution Center, 4343 East Fremont Street in Stockton, California. The <br /> destruction activities were performed on August 21, 1996 under San Joaquin Public Health <br /> Services(SJCPHS)permit#009285 and your personal supervision. The well was sealed in <br /> place by pressure grouting the lower portion of the well with neat cement from the total <br /> depth of 94.5 feet below ground surface (BGS) to 20 feet BGS. The upper 20 feet of the <br /> well was drilled out using 10-inch diameter hollow-stem drilling equipment and the <br /> resulting open borehole was backfilled to the surface with neat cement. The drill cuttings <br /> from the upper 20 feet of the well were temporarily stored in two 55-gallon drums. These <br /> drums were removed and disposed of at the BFI-Vasco Road Landfill on August 30, 1996. <br /> The transport manifest is attached. <br /> It is EMCON's understanding that this well destruction completes closure activities and <br /> that no further action is required concerning this site. Please call if you have any questions. <br /> Sincerely, <br /> EMCON DRAFT <br /> Terry Gyrion Mark Smolley <br /> Geologist Project Manager <br /> Attachments: Drum Transport Manifest <br /> cc: Binayak Acharya-Nestle <br /> Project File <br /> FSJIH:W ESTLEISTOCKTON.DOC-95Vhg:1 <br />