My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:09:43 PM
Creation date
1/14/2020 4:24:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` Stantec ew sulting Corporation <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> Tel: (916)861-0400 <br /> CU <br /> Fax: (916)861-0430 D <br /> Stantec FP-13 2 2 2010 <br /> ENVIRONMENT HEALTH <br /> PERMIT/SERVICE, <br /> February 19, 2010 <br /> File: 185702120.200.0003 <br /> San Joaquin Environmental.Health Department <br /> 600 East Main Street <br /> Stockton, California 95202 <br /> Reference: Soil Boring Permit Application Packet <br /> PG&E Former General Construction Yard <br /> 401 French Camp Road <br /> French Camp, California <br /> To Mike Infurna <br /> On behalf of Pacific Gas and Electric (PG&E), Stantec Consulting Corporation (Stantec) submits <br /> this well permit application packet for the advancement of up to three direct push soil borings <br /> (SB-5B, SB-7B, and SB-8B) at the above-referenced property. This current scope of work is in <br /> conjunction with Stantec's February 9, 2010 Work Plan for Additional Site Characterization. The <br /> California Regional Water Quality Control Board (RWQCB) approved the work plan in there <br /> February 17, 2010 letter. <br /> i <br /> The permit application acket includes the following; <br /> • Well estruction ermit application for the advancement of soil borings; <br /> ? icensed on ractor Declaration (LCD) <br /> • Permit fee ($89.00) <br /> • Site Plan with Proposed Soil Borings <br /> Drilling activities are tentatively scheduled to begin March 3, 2010. All work will be done in <br /> accordance with the approved February 9, 2010 Work Plan for Additional Site Characterization. <br /> -71j -oQfj d X10 <br /> D Sv yL3 <br /> Z/AS/i°. <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.