My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
401
>
2900 - Site Mitigation Program
>
PR0524769
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 5:09:43 PM
Creation date
1/14/2020 4:24:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524769
PE
2960
FACILITY_ID
FA0016627
FACILITY_NAME
PG&E FRENCH CAMP YARD
STREET_NUMBER
401
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19314013
CURRENT_STATUS
02
SITE_LOCATION
401 E FRENCH CAMP RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Mike Infurna [EH] <br /> From: Rorie, Bryan [Bryan.Rorie@stantec.com] <br /> Sent: Thursday, October 08,2009 1:23 PM <br /> To: Mike Infurna[EH] <br /> Subject: RE: PG&E, French Camp <br /> Attachments: 20091007160720 pdf-Adobe Acrobat Standard pdf;VAPOR.PROBE-DUAL-VE-2.pdf <br /> Mike, <br /> The following addresses your concerns regarding the well installation permit application submitted on <br /> September 29, 2009. <br /> 1- signed access agreement from Mr. Glllit to PG&E fallowing access. <br /> Attached is the signed access agreement between Mr. Gillit and PG&Ejfor the off-site investigation. <br /> 2- discussion/plan on the destruction of the probes after their'use. (method and <br /> materials) e <br /> Once it is determined that no additonal soil gas samples are needed, Stantec will submit the necessary well <br /> destruction permits and destroy the vapor points in accordance to San Joaquin Environmental Health Department <br /> requirements. The exact well destruction method will be detailed in the well destruction permit cover letter. In <br /> general,the well locations will be over drilled either by hand auger,air knife, or drill rig,the well box and casing <br /> material will be completely removed, and the borings will be backfilled with an approved seal material. <br /> '3- duration probes anticipated to be in the ground.(aff.ects if additional destruction <br /> permit required) <br /> The vapor probes are anticipatedto be in the ground for up to approximately 12 months. <br /> 4- well/probe specifications (narrative) and diagram to scale of construction details <br /> showing depths, widths, finish, etc. <br /> Attached is a general diagram showing dual nested vapor probe construction (not site specific). Site <br /> specific depths, widths, and finishing details were described in detail in the well permit application <br /> cover letter. <br /> Bryan Rorie <br /> Project Scientist <br /> Stantec <br /> Ph: (916)384-0785 <br /> �Fx: (916)861-0430 <br /> Cell: (916)296-8653 <br /> bryan.rorie@stantec.com <br /> stantec.com <br /> The content of this email is the confidential property of Stantec and should not be copied,modified, retransmitted,or used for <br /> any purpose except with Stantec's written authorization. If you are not the intended recipient,,please delete all copies and <br /> notify us immediately. <br /> ( y Please consider the environment before;printing this email. <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Tuesday, October 06, 2009 8:36 AM <br /> To: Rorie, Bryan <br /> Subject: PG&E, French Camp <br /> 10/8/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.