Laserfiche WebLink
Stantec <br /> February 9,2010 <br /> Kristi Shelton <br /> Page 4 of 6 <br /> Reference: Work Plan for Additional Site Characterization <br /> Borehole Abandonment and Waste Management <br /> Following completion of sampling activities, soil borings will be backfilled in accordance with permit <br /> requirements, and finished to match existing grade. Soil cuttings and decontamination fluids will be <br /> stored in 55-gallon steel drums pending characterization and disposal. <br /> I:\PG&E\French Camp\2010 Remediation\Work Plans\PGE French Camp_2010 WP_fnl.doc <br />