Laserfiche WebLink
Stalntec <br /> February 9,2010 <br /> Kristi Shelton <br /> Page 6 of 6. <br /> i <br /> Reference: Work Pian for Additional Site Characterization <br /> i <br /> Should you have any questions or concerns regarding these proposed activities, please feel free to <br /> contact the undersigned at (_916) 861-0400, or Anne Conner(PG&E project manager) at(925)415- <br /> 6381. <br /> Sincerely, <br /> STANTEC CONSULTING CORPORATION <br /> Bryan Rone <br /> Project Scientist <br /> Tel: (916) 384-0785 <br /> Fax: (916)861-0430 <br /> ,brya n.ro rie@stantec.com: <br /> Neil Doran, P.G. <br /> Senior Geologist/Project Manager moo ► C'FO� <br /> Tel: (916) 384-0722 <br /> Fax: (916)861-0430 O® ,Nlr1't~t.t,; '• <br /> neii.doran@stantec.Corn DORAN <br /> Enclosures: <br /> Figure 1 —Site Location Map <br /> Figure 2—Site Plan with Proposed Soil Boring Locations <br /> i <br /> i <br /> I:XPG&E1French Camp=10 Remediation\Work Plahs\PGE.French Camp_2010 WP_f IAM <br />